Date: May 2018 ~ August 2019
Project Location: Philippines
Application: Industrial Power Plant Usage
Customer: Engineering Company
Capacity: 2x 125TPH MMF & 2x 5TPH Double Pass RO plus EDI
Treatment Process: MMF - RO - EDI
Special Requirements
Difficulties and Solutions
"Difficulty: Power plants require water with extremely low conductivity and minimal silica levels to protect sensitive equipment like boilers and turbines. Meeting these standards while ensuring system reliability and efficiency was critical.
Solution: Instead of a single 10 m³/h system, we designed two parallel 5 m³/h systems. This ensures uninterrupted operation; if one unit requires maintenance, the other can continue to meet the plant’s needs. The modular design also allows for easier maintenance. "
Date: May 2018 ~ August 2019
Project Location: Philippines
Application: Industrial Power Plant Usage
Customer: Engineering Company
Capacity: 2x 125TPH MMF & 2x 5TPH Double Pass RO plus EDI
Treatment Process: MMF - RO - EDI
Special Requirements
Difficulties and Solutions
"Difficulty: Power plants require water with extremely low conductivity and minimal silica levels to protect sensitive equipment like boilers and turbines. Meeting these standards while ensuring system reliability and efficiency was critical.
Solution: Instead of a single 10 m³/h system, we designed two parallel 5 m³/h systems. This ensures uninterrupted operation; if one unit requires maintenance, the other can continue to meet the plant’s needs. The modular design also allows for easier maintenance. "